首页 / 解决方案

Oil & Gas / Pipelines Russia — 大载重垂直起降

大载重工业主力平台。

该市场的典型任务

该市场运营条件Very long asset corridors, sub-zero winter operation, and remote sites reached only by seasonal roads.
认证与合规For the EAEU market the EAC (EAC) conformity mark is normally required; confirm the exact declaration set and HS/HS code with the importer.
物流Transhipment through Baltic or Black Sea ports; rail inland to the customer's region.. Main gateways: Novorossiysk, St Petersburg, Vostochny.
买家关注点Buyers compare endurance per sortie and expect documentation in Russian, with the EAC package attached to the first batch.

如何评估供应商

推荐机型

推荐机型最大载荷最大航时主要用途
大载重垂直起降固定翼 3800–480015–30 kg240–360 min大载重运输
TY-05 / 05A / 05B 系列15–50 kg70 min – 6–7 h远程勘测

买家常见问题

QuestionAnswer
How many hours of corridor can one aircraft cover per sortie with an IR payload?Endurance over a linear asset — sorties are counted in hundreds of kilometres, not minutes
What wind limit and service ceiling should we assume for desert and winter sites?Sensor payload headroom for gimbal EO/IR plus a LiDAR unit simultaneously
Can you supply the EAC documentation set with the first production batch?Operating temperature envelope: desert heat or sub-zero winter both affect endurance
获取报价

告诉我们任务参数——载荷、面积、航时目标——我们回复匹配机型、交期与贵市场的认证路径。

大载重垂直起降 specifications →  |  Become a partner/distributor →

获取报价

提交询盘

TYI UAV — OEM/ODM fixed-wing VTOL manufacturer, CE/EAC certified. 更新于 2026-11-11.